HARRIS ROAD over W.BR.SUGAR RIVER

2.4 MI W CONSTABLEVILLE · County 049, New York · Built 1940 · 1 Lanes · 68 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000003340420
Year Built
1940
Reconstructed
2006
Length
10.7 m (35.1 ft)
Max Span
10.3 m
Width
5.6 m (18.4 ft)
Lanes
1
Daily Traffic
68
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$198,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.