RTE 971V over BLACK RIVER

1 MI NE OF BLACK RIVER · County 045, New York · Built 1942 · 2 Lanes · 2,599 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000003338960
Year Built
1942
Reconstructed
2013
Length
127.4 m (418 ft)
Max Span
47.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
2,599
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,187,000
Total Project Cost
$6,639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.