PUP HILL ROAD over SARANAC RIVER

0.6 MI NE REDFORD · County 019, New York · Built 1988 · 1 Lanes · 213 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003335720
Year Built
1988
Length
61 m (200.1 ft)
Max Span
60.7 m
Width
4.2 m (13.8 ft)
Lanes
1
Daily Traffic
213
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,017,000
Total Project Cost
$3,198,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.