CR 3 over DEAN CREEK

2.0 MI E OF VAN ETTEN · County 107, New York · Built 1931 · 2 Lanes · 246 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003334840
Year Built
1931
Reconstructed
1994
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
246
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$297,000
Total Project Cost
$470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.