FEDERAL ROAD over TRIB BALDWIN CRK

0.4 MI NE OF N CHEMUNG · County 015, New York · Built 1992 · 2 Lanes · 506 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000003331290
Year Built
1992
Length
10.7 m (35.1 ft)
Max Span
10 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
506
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$502,000
Total Project Cost
$796,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.