COUNTY ROAD 23 over DRY BROOK

3.3 MI NE OF CHEMUNG · County 015, New York · Built 1934 · 2 Lanes · 339 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000003331150
Year Built
1934
Reconstructed
1994
Length
9.1 m (29.9 ft)
Max Span
7.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
339
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$349,000
Total Project Cost
$553,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.