PECK SETTLEMENT over TRB CONEWANGO CRK

4 MILES S. OF FALCONER · County 013, New York · Built 1999 · 2 Lanes · 3,252 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
000000003324440
Year Built
1999
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
3,252
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$596,000
Total Project Cost
$946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.