SENECA POINT ROAD over SENECA POINT GLLY

IN SOUTH BRISTOL · County 069, New York · Built 1992 · 2 Lanes · 425 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000003318050
Year Built
1992
Length
11.3 m (37.1 ft)
Max Span
10.3 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
425
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$416,000
Total Project Cost
$659,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.