CEMETERY DRIVE over SCRIBA CREEK

AT CONSTANTIA · County 075, New York · Built 1988 · 2 Lanes · 53 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
000000003208750
Year Built
1988
Reconstructed
2020
Length
11 m (36.1 ft)
Max Span
10.4 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
53
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$279,000
Total Project Cost
$442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.