River Road over Kingsley Brook

JTN at RIVER RD & BRIGGS · County 053, New York · Built 2023 · 2 Lanes · 1,412 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000002271700
Year Built
2023
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
1,412
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$203,000
Total Project Cost
$321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.