French Pond Rd over Cold Brook

2mi SE Vil So.Colton · County 089, New York · Built 2006 · 2 Lanes · 35 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
000000002270210
Year Built
2006
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Lanes
2
Daily Traffic
35
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$191,000
Total Project Cost
$303,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.