DEER LANE over ESOPUS CREEK OVERFLOW

4.7 MI SW JCT NY42+NY28 · County 111, New York · Built 2009 · 1 Lanes · 11 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000002270070
Year Built
2009
Length
13.4 m (44 ft)
Max Span
12.5 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
11
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$271,000
Total Project Cost
$429,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.