STONINGTON HILL RO over VLY CREEK

0.2 MI E JCT RTS 85A &156 · County 001, New York · Built 1999 · 2 Lanes · 1,641 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
000000002269230
Year Built
1999
Length
12.2 m (40 ft)
Max Span
11.5 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
1,641
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$395,000
Total Project Cost
$626,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.