PINE HILL DRIVE over BIRD CREEK

1.0 MI S OF NYS ROUTE 328 · County 015, New York · Built 2017 · 2 Lanes · 373 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000002269090
Year Built
2017
Length
17.1 m (56.1 ft)
Max Span
15.5 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
373
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$627,000
Total Project Cost
$995,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.