BACKER ROAD over EATON HOLLOW CRK

1 MILE NE OF POST CREEK · County 015, New York · Built 1980 · 2 Lanes · 204 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
5
Fair

Bridge Details

Structure #
000000002268470
Year Built
1980
Reconstructed
2003
Length
7.9 m (25.9 ft)
Max Span
7 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
204
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$329,000
Total Project Cost
$522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.