CHAPEL WOODS over DRAINAGE DITCH26B

NE 0F KLEIN & YOUNGS · County 029, New York · Built 2010 · 2 Lanes · 1,045 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000002268090
Year Built
2010
Length
7 m (23 ft)
Max Span
6.4 m
Width
24 m (78.7 ft)
Lanes
2
Daily Traffic
1,045
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$558,000
Total Project Cost
$884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.