SOUTH BARRY AVE over OTTER CREEK TIDAL BASIN

IN MAMARONECK/SHORE ACRES · County 119, New York · Built 1930 · 2 Lanes · 97 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000002265790
Year Built
1930
Reconstructed
2003
Length
10.1 m (33.1 ft)
Max Span
9.8 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
97
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$534,000
Total Project Cost
$847,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.