PRESTON WAY over MNRR HA LINE

0.3 MI SE SMRP Exit 37 · County 119, New York · Built 1953 · 2 Lanes · 11,232 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
3
Serious
Substructure
5
Fair

Bridge Details

Structure #
000000002265420
Year Built
1953
Length
55.2 m (181.1 ft)
Max Span
22.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
11,232
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,509,000
Total Project Cost
$3,979,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.