BLACK CREEK ROAD over BLACK CREEK

0.7 S OF ESOPUS · County 111, New York · Built 1915 · 2 Lanes · 148 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000002264100
Year Built
1915
Length
11.3 m (37.1 ft)
Max Span
9.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
148
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$436,000
Total Project Cost
$691,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.