ST. JAMES STREET over SANILAC STREET
0.5 MI NE JCT RTS 78 &130 · County 029, New York · Built 1930 · 2 Lanes · 379 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.905689, -78.685233
This bridge is in worse condition than 68.2% of bridges in County 029. The average bridge in New York is 0 years old; this one is 96 years old.
Nearby Bridges
RTE 20 over CAYUGA CREEK
Built 2002
PENORA STREET over CAYUGA CREEK
Built 1954
AURORA STREET over CAYUGA CREEK
Built 1982
RTE 20 over CAYUGA CREEK
Built 1929
RTE 20 over CAYUGA CREEK
Built 2002
COMMERCE PARKWAY over CENTRAL AVENUE
Built 1950
CLARK STREET over PLUM BOTTOM CREEK
Built 1996
RTE 78 over SCAJAQUADA CREEK
Built 1953
GEORGE URBAN BLVD over SCAJAQUADA CREEK
Built 1977
SCHOOL STREET over PLUM BOTTOM CREEK
Built 1987
Bridge Details
- Structure #
- 000000002263960
- Year Built
- 1930
- Reconstructed
- 1986
- Length
- 16.8 m (55.1 ft)
- Max Span
- 15.8 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 379
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $599,000
- Total Project Cost
- $950,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.