ST. JAMES STREET over SANILAC STREET

0.5 MI NE JCT RTS 78 &130 · County 029, New York · Built 1930 · 2 Lanes · 379 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000002263960
Year Built
1930
Reconstructed
1986
Length
16.8 m (55.1 ft)
Max Span
15.8 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
379
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$599,000
Total Project Cost
$950,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.