NEW BOSTON STREET over OWLVILLE CREEK

0.33 MI SW OF CANASTOTA · County 053, New York · Built 2021 · 2 Lanes · 2,386 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000002263270
Year Built
2021
Length
16.7 m (54.8 ft)
Max Span
15.5 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
2,386
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$340,000
Total Project Cost
$539,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.