MILLIE EDWARDS ROA over ALDER CREEK

0.5 MI NE OF TURNWOOD · County 111, New York · Built 1994 · 1 Lanes · 11 vehicles/day

Overall
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000002262930
Year Built
1994
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
11
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$256,000
Total Project Cost
$406,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.