NORTON LANE over TITICUS RIVER

5.4 MI E OF CROTON FALLS · County 119, New York · Built 1955 · 2 Lanes · 121 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000002262490
Year Built
1955
Reconstructed
2012
Length
6.4 m (21 ft)
Max Span
6 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
121
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$507,000
Total Project Cost
$804,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.