INSTITUTE AVENUE over CHADAKOIN RIVER
AT JAMESTOWN · County 013, New York · Built 1976 · 2 Lanes · 888 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
42.092381, -79.235033
This bridge is in worse condition than 91.2% of bridges in County 013. The average bridge in New York is 0 years old; this one is 50 years old.
Nearby Bridges
HARRISON STREET over CHADAKOIN RIVER
Built 2019
FOOTE AVENUE over CHADAKOIN RIVER
Built 2022
SOUTH MAIN STREET over CHADAKOIN RIVER
Built 1872
RTE 60 over W HARRISON STREET CHADA
Built 2010
HARRISON STREET over CHADAKOIN RIVER
Built 2004
WINSOR STREET over CHADAKOIN RIVER
Built 2004
CHANDLER STREET over CHADAKOIN RIVER
Built 1974
SPRAGUE STREET over CHADAKOIN RIVER
Built 2012
RTE 954 over STEELE STREET CHADAKOIN
Built 1988
RTE 394 over LOCAL ACCESS ROAD CHADA
Built 1990
Bridge Details
- Structure #
- 000000002258380
- Year Built
- 1976
- Length
- 18 m (59.1 ft)
- Max Span
- 17.6 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 888
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $978,000
- Total Project Cost
- $1,550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.