SHONGO VALLEY ROAD over SHONGO CREEK

1.4 MI NE OF CANEADEA · County 003, New York · Built 1982 · 2 Lanes · 189 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002254420
Year Built
1982
Reconstructed
2002
Length
9.4 m (30.8 ft)
Max Span
8.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
189
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$422,000
Total Project Cost
$668,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.