TO GWB OPP 171 ST over RIVERSIDE DRIVE

S OF GEORGE WASHINGTON BR · County 061, New York · Built 1930 · 1 Lanes · 11,585 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002245480
Year Built
1930
Reconstructed
2000
Length
41.1 m (134.8 ft)
Max Span
41.1 m
Width
24.4 m (80.1 ft)
Lanes
1
Daily Traffic
11,585
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$31,094,000
Total Project Cost
$49,302,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.