WASHINGTON DRIVE over FULLER HOLLOW CK

1.0 MI S OF JOHNSON CITY · County 007, New York · Built 2021 · 2 Lanes · 2,621 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000002226010
Year Built
2021
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,621
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$375,000
Total Project Cost
$594,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.