SMITH DRIVE over PATTERSON CREEK

1 MI N OF HOOPER RD RAMP · County 007, New York · Built 1970 · 2 Lanes · 1,371 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002225780
Year Built
1970
Length
11.6 m (38.1 ft)
Max Span
11.2 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
1,371
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$860,000
Total Project Cost
$1,364,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.