SILVER HOLLOW ROAD over STONY CLOVE CREEK

0.4 MI.E.OF CHICHESTER · County 111, New York · Built 1985 · 2 Lanes · 195 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002224560
Year Built
1985
Length
24.1 m (79.1 ft)
Max Span
23.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
195
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$897,000
Total Project Cost
$1,422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.