FINGAR ROAD over MUD CREEK

2.1 MI SW OF CLAVERACK · County 021, New York · Built 1915 · 2 Lanes · 143 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002222610
Year Built
1915
Reconstructed
1980
Length
7.3 m (24 ft)
Max Span
7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
143
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$476,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.