HESELTAN GULLY ROA over MARSH CREEK

0.6 MILES NE WHITESVILLE · County 003, New York · Built 1973 · 2 Lanes · 140 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002214840
Year Built
1973
Reconstructed
1991
Length
9.1 m (29.9 ft)
Max Span
8.5 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
140
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$443,000
Total Project Cost
$702,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.