HOTCHKISS HOLLOW R over HOTCHKISS RUN

2.6 MI SW OF STEAMBURG · County 009, New York · Built 2016 · 2 Lanes · 26 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000002211940
Year Built
2016
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
26
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$303,000
Total Project Cost
$481,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.