BOON STREET over STEUBEN CREEK

AT BARNEVELD · County 065, New York · Built 1915 · 2 Lanes · 628 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000002206330
Year Built
1915
Length
17.4 m (57.1 ft)
Max Span
8.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
628
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$521,000
Total Project Cost
$826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.