FACTORY HOLLOW RD over SUNKAUISSIA CREEK

0.8 MI W RTE 7 PITTSTOWN · County 083, New York · Built 1910 · 1 Lanes · 110 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000002201790
Year Built
1910
Reconstructed
2014
Length
14.6 m (47.9 ft)
Max Span
14 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
110
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$218,000
Total Project Cost
$346,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.