I787 SB TO SMX WB over SM-OFF TO PEARL ST GREE

0.4 m W I-787SB Exit 3A · County 001, New York · Built 1973 · 1 Lanes · 4,023 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000109297A
Year Built
1973
Reconstructed
2020
Length
257.6 m (845.1 ft)
Max Span
44.5 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
4,023
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,402,000
Total Project Cost
$8,566,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.