NB RAMP TO 921C N over MAIN STREET RELIEF WAT

.2 MI N JCT SH 5S & 921C · County 065, New York · Built 1973 · 2 Lanes · 9,230 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000109050A
Year Built
1973
Reconstructed
2009
Length
115.5 m (378.9 ft)
Max Span
30.7 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
9,230
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,391,000
Total Project Cost
$3,791,000