RTE 8 over Trib to W Br Unadilla Ri

0.7M N of NY8/US20 · County 065, New York · Built 2022 · 2 Lanes · 4,372 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000001080320
Year Built
2022
Length
7.9 m (25.9 ft)
Max Span
7 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
4,372
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$260,000
Total Project Cost
$412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.