PUTNAM POND CAMPGR over PUTNAM CREEK

3.5 m SW of Route 74 · County 031, New York · Built 2015 · 2 Lanes

Overall
Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
000000001079860
Year Built
2015
Length
10.1 m (33.1 ft)
Max Span
9.4 m
Width
7.3 m (24 ft)
Lanes
2
Material
Concrete
Design
Frame (except frame culverts)
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$307,000
Total Project Cost
$486,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.