RTE 987G over SHRUB OAK CREEK

0.3 MI S OF JCT US6 & TSP · County 119, New York · Built 2005 · 8 Lanes · 45,980 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001077730
Year Built
2005
Length
9.8 m (32.2 ft)
Max Span
8.5 m
Width
52.4 m (171.9 ft)
Lanes
8
Daily Traffic
45,980
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,727,000
Total Project Cost
$2,738,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.