RTE 89 over FLOOD CONTROL CHANNEL C

0.5 mi N of W Buffalo St · County 109, New York · Built 1997 · 2 Lanes · 6,436 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001077240
Year Built
1997
Length
121.9 m (399.9 ft)
Max Span
61.5 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
6,436
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,865,000
Total Project Cost
$6,128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.