SOUTH 3RD STREET over RTE I278

2.4 MI SW JCT I278 & I495 · County 047, New York · Built 1957 · 6 Lanes

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000001076459
Year Built
1957
Length
16.2 m (53.1 ft)
Max Span
15.5 m
Width
36.1 m (118.4 ft)
Lanes
6
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,004,000
Total Project Cost
$11,105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.