RTE I88 over UNNAMED STREAM SUITS RA

2.2 MI E JCT I88 & US 20 · County 093, New York · Built 1978 · 3 Lanes · 7,111 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000001070671
Year Built
1978
Reconstructed
2011
Length
110.6 m (362.9 ft)
Max Span
57.9 m
Width
14.9 m (48.9 ft)
Lanes
3
Daily Traffic
7,111
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,315,000
Total Project Cost
$6,842,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.