NORTH MIDDLETOWN R over 987C 987C85011095 RTE 9

1.2 MI N JCT PIP & SH 304 · County 087, New York · Built 1953 · 3 Lanes · 5,694 vehicles/day

Overall
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000001068710
Year Built
1953
Length
42.7 m (140.1 ft)
Max Span
18.2 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
5,694
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$3,944,000
Total Project Cost
$6,254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.