RTE 907H over EAST 180TH STREET MORRI

.4 MI N I95+BX RIVER PKWY · County 005, New York · Built 1951 · 6 Lanes · 112,038 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000001067099
Year Built
1951
Length
456.3 m (1497 ft)
Max Span
45.7 m
Width
26.2 m (86 ft)
Lanes
6
Daily Traffic
112,038
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$64,054,000
Total Project Cost
$101,565,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.