S ALBANY CRESCENT over 87I87IX1M12060 RTE I87

2.6 MI N I87+I95 · County 005, New York · Built 1955 · 3 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000106697B
Year Built
1955
Length
93.9 m (308.1 ft)
Max Span
9.1 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
1,200
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,461,000
Total Project Cost
$16,587,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.