RTE I278 over AT CLINTON ST

Gowanus EB to BQE EB · County 047, New York · Built 1964 · 2 Lanes · 181,470 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
00000000106531N
Year Built
1964
Reconstructed
2006
Length
135.9 m (445.9 ft)
Max Span
14.9 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
181,470
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,688,000
Total Project Cost
$20,118,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.