RTE 17 over COVERED BRIDGE RD WILLO

07 MI NW EXIT 96 RTE 17 · County 105, New York · Built 1966 · 2 Lanes · 5,452 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000001063411
Year Built
1966
Reconstructed
1992
Length
133.8 m (439 ft)
Max Span
39.6 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
5,452
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,929,000
Total Project Cost
$6,229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.