RTE 908M over STRAIGHT PATH

1.8 MI E JCT SH 109 & SSP · County 103, New York · Built 1941 · 8 Lanes · 138,738 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000001059779
Year Built
1941
Length
22.5 m (73.8 ft)
Max Span
21 m
Width
37.2 m (122 ft)
Lanes
8
Daily Traffic
138,738
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,771,000
Total Project Cost
$10,737,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.