RTE I678 over FLUSHING CREEK MEADOW L

JCT I495+RTE 678 · County 081, New York · Built 1963 · 6 Lanes · 127,491 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000001055789
Year Built
1963
Reconstructed
2022
Length
3001.7 m (9848.1 ft)
Max Span
54.9 m
Width
28.7 m (94.2 ft)
Lanes
6
Daily Traffic
127,491
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$433,081,000
Total Project Cost
$686,694,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.