RTE I678 over FLUSHING CREEK MEADOW L
JCT I495+RTE 678 · County 081, New York · Built 1963 · 6 Lanes · 127,491 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
40.762581, -73.839975
This bridge is in worse condition than 90.6% of bridges in County 081. The average bridge in New York is 0 years old; this one is 63 years old.
Nearby Bridges
RTE I678 over RTE 25A
Built 1963
RTE I678 over 25AX FLUSHING BAY PROME
Built 2009
25AX(WB) TO I678 over RELIEF
Built 1981
RTE I678 over 25A (EB) U-TURN FLUSHIN
Built 1963
RTE I678 over 25AX 25AX E TO 25AX W
Built 1963
25AX W over 678IX5M12076 RELIEF
Built 1963
Ramp to Linden Pl over Whitestone Expressway Se
Built 2007
RTE I678 over RELIEF
Built 1963
RTE 25A over 678I X5M1 1075 678I X5M
Built 1981
RTE 25A over 678I X5M1 1075 678I X5M
Built 1981
Bridge Details
- Structure #
- 000000001055789
- Year Built
- 1963
- Reconstructed
- 2022
- Length
- 3001.7 m (9848.1 ft)
- Max Span
- 54.9 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 6
- Daily Traffic
- 127,491
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $433,081,000
- Total Project Cost
- $686,694,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.