RTE 9A over RTE 100
2.7 MI S JCT RTE 100+TSP · County 119, New York · Built 1931 · 4 Lanes · 35,998 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.149728, -73.825547
This bridge is in worse condition than 59.3% of bridges in County 119. The average bridge in New York is 0 years old; this one is 95 years old.
Nearby Bridges
RTE 9A over POCANTICO RIVER
Built 1931
RTE 100 over POCANTICO RIVER
Built 1967
RTE 100 over POCANTICO RIVER
Built 1967
RT 100 RAMP TO 9A over POCANTICO RIVER
Built 1967
RTE 9A over POCANTICO RIVER
Built 1928
PLEASANTVILLE RD over ACCESS TO RT9A100
Built 1911
PLEASANTVLLE ROAD over RTE 9A 9A 9A87032131
Built 1932
TODD LANE over POCANTICO RIVER
Built 2006
PLEASANTVILLE RD over POCANTICO RIVER
Built 2020
RTE 987G over PLEASANTVILLE ROAD
Built 1993
Bridge Details
- Structure #
- 000000001054440
- Year Built
- 1931
- Length
- 28.7 m (94.2 ft)
- Max Span
- 22.8 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 4
- Daily Traffic
- 35,998
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,149,000
- Total Project Cost
- $6,579,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.